VACANCIES FOR FLEMING DOOR AND COATINGS – MAY 2021

Please see the Job descriptions for the vacancies in the links below

JOB VACANCY – doors engineer April 21

Powder Coating Operative 050521

VACANCY – FINANCIAL CONTROLLER – CLOSED

Please see job description for the Financial Controller position and details on how to contact on the below link.

FC Job Description 210318

VACANCY – General Operative – Position filled

Please Click on the link below for further details of the General Operative Role.

General Operative 040817

Credit Controller Vacancy – Extended – Now Closing 07/08/17

Please Click on the below link for further details.

Accounts – Credit Controller.docx

General Operative Vacancy: Position Filled

Please click on the link below for further details and how to apply for the General Operative position.

Click here for details of General Operator Position

Doors Engineer Vacancy: Position Filled

Please click on the link below for further details and how to apply for the Doors Engineer position.

Click here for details of the Door Engineer position.

Accounts Administrator Vacancy: Position Filled

Please click on the link below for further details and how to apply for the Accounts Administrator position.

Click here for details of the Accounts Administrator position.

Operations Manager Vacancy 14/04/2016 – Now Filled

Please use the link below to find out more about the current Operations Manager vacancy we have at our base in St.Johnston Co.Donegal. E-mail andrew@fleming-steel.com your C.V and covering letter by the 22nd April 2016 if interested.

Ops Manager 140416

The Operations Manager position has now been filled. Thank you for your interest.

Fleming Ltd Sponsor Raphoe Fatstock – Supreme Heifer class.

Fleming were pleased to sponsor the Supreme Heifer class at the Raphoe Fatstock Sale recently.

John Mc Geehan from our sales team presented the prize on the day.

Congratulations to all at Raphoe Livestock Mart and those who took part in the sale.

Fleming Coatings Paint Belfast Flagship Project

Fleming Coatings recently completed a specialist paint project for one of our clients -Multispan Steel and also in conjunction with Ridgeway as part of the Titanic Quarter in Belfast

Fleming’s applied a two pack surface tolerant abrasion resistant, high solids, polyamine cured epoxy mastic coating to the 850 tonne of steel work at our premises here in St. Johnston, Co, Donegal

Part of the challenge with this project was to ensure the atmospheric conditions were correct to allow the paint to dry properly thus maximise the paint adhesion, we achieved this through our quality control processes such as regular D.F.T readings, temperature and dew point monitoring.

Fleming Coatings have the ability to apply from 25- 500 microns of various paints, this along with our technical support system means – ”when it comes to coatings we have it covered”.

The images below show the completed building which is a purpose built film studio.